← Boston
Boston Harbor Hotel
70 ROWES WH, BOSTON, MA 02110
Last inspected Jul 2, 2026
✕
FailedOrder for delivery
Inspection history
Jul 2, 2026
✕8 violations
- (A)-(P) Person-In-Charge-Duties (Pf)
- Packaged and Unpackaged Food-Separation Packaging and Segregation (P)
- Reduced Oxygen Packaging Criteria (Pf)
- Wood Use Limitation (C)
- (A) Equipment Food-Contact Surfaces Nonfood-Contact Surfaces and Utensils (Pf)
- Backflow Prevention Air Gap (P)
- Using a Handwashing Sink-Operation and Maintenance (Pf)
- Wall and Ceiling Coverings and Coatings (C)
Jun 25, 2026
✕8 violations
- (A)-(P) Person-In-Charge-Duties (Pf)
- Packaged and Unpackaged Food-Separation Packaging and Segregation (P)
- Reduced Oxygen Packaging Criteria (Pf)
- Wood Use Limitation (C)
- (A) Equipment Food-Contact Surfaces Nonfood-Contact Surfaces and Utensils (Pf)
- Backflow Prevention Air Gap (P)
- Using a Handwashing Sink-Operation and Maintenance (Pf)
- Wall and Ceiling Coverings and Coatings (C)
Dec 23, 2025
✓1 violation
- Cleaning Ventilation Systems Nuisance and Discharge Prohibition (C)
Dec 12, 2025
✕7 violations
- Food Storage Containers Identified with Common Name of Food (C)
- In-Use Utensils Between-Use Storage (C)
- (A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
- Service Sink (C)
- Floors Walls and Ceilings-Cleanability (C)
- Cleaning Ventilation Systems Nuisance and Discharge Prohibition (C)
- Drying Mops (C)
Dec 5, 2025
✕7 violations
- Food Storage Containers Identified with Common Name of Food (C)
- In-Use Utensils Between-Use Storage (C)
- (A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
- Service Sink (C)
- Floors Walls and Ceilings-Cleanability (C)
- Cleaning Ventilation Systems Nuisance and Discharge Prohibition (C)
- Drying Mops (C)
Dec 16, 2024
✓Oct 31, 2024
–Aug 4, 2023
✓1 violation
- Shell stock Maintaining Identification (Pf)
Jul 28, 2023
✕1 violation
- Shell stock Maintaining Identification (Pf)
Apr 7, 2023
✓2 violations
- (A)-(P) Person-In-Charge-Duties (Pf)
- Conformance with Approved Procedures (Pf)
Mar 24, 2023
✕4 violations
- (A)-(P) Person-In-Charge-Duties (Pf)
- Shell stock Maintaining Identification (Pf)
- Repairing-Premises Structures Attachments and Fixtures-Methods (C)
- Conformance with Approved Procedures (Pf)
Mar 9, 2023
✕4 violations
- (A)-(P) Person-In-Charge-Duties (Pf)
- Shell stock Maintaining Identification (Pf)
- Repairing-Premises Structures Attachments and Fixtures-Methods (C)
- Conformance with Approved Procedures (Pf)
Jan 18, 2023
–Nov 29, 2022
✓1 violation
- Floors Walls and Ceilings-Cleanability (C)
Jul 25, 2022
✓4 violations
- (A)-(P) Person-In-Charge-Duties (Pf)
- Wiping Cloths Use Limitation (C)
- Floors Walls and Ceilings-Cleanability (C)
- Repairing-Premises Structures Attachments and Fixtures-Methods (C)
Jul 18, 2022
✕4 violations
- (A)-(P) Person-In-Charge-Duties (Pf)
- Wiping Cloths Use Limitation (C)
- Floors Walls and Ceilings-Cleanability (C)
- Repairing-Premises Structures Attachments and Fixtures-Methods (C)
Mar 15, 2022
–Aug 10, 2021
✓Mar 3, 2021
✓2 violations
- Ready-To-Eat Time/Temperature Control for Safety Food Disposition (P)
- Floor and Wall Junctures Coved and Enclosed or Sealed (C)
Feb 22, 2021
✕2 violations
- Ready-To-Eat Time/Temperature Control for Safety Food Disposition (P)
- Floor and Wall Junctures Coved and Enclosed or Sealed (C)
Nov 17, 2020
–Nov 16, 2020
✓Nov 12, 2020
–Aug 3, 2020
✓Nov 26, 2019
✓
More in Boston
Source: Boston Public Health Commission. Data shown unmodified from the official record. See something wrong? Report a data issue.
