← Boston
Mario Market
49 COTTAGE ST, EAST BOSTON, MA 02128
Last inspected Mar 15, 2022
Not graded. The source hasn't reported a grade or result for the latest record. CleanPlate never invents one.
–
Not gradedOrder for delivery
Inspection history
Mar 15, 2022
–Mar 24, 2014
✓8 violations
- Non-Food Contact Surfaces
- Equipment Thermometers
- Test Kit Provided
- Non-Food Contact Surfaces Clean
- Hand Cleaner Drying Tissue Signage
- Improper Maintenance of Floors
- Separation/Sanitizer Criteria
- Premises Maintained
Mar 14, 2014
✕8 violations
- Non-Food Contact Surfaces
- Equipment Thermometers
- Test Kit Provided
- Non-Food Contact Surfaces Clean
- Hand Cleaner Drying Tissue Signage
- Improper Maintenance of Floors
- Separation/Sanitizer Criteria
- Premises Maintained
Dec 30, 2013
–Jul 18, 2013
✓6 violations
- Food Protection
- Test Kit Provided
- Location Accessible
- Hand Cleaner Drying Tissue Signage
- Walls/Ceilings Designed Constructed Installed
- Premises Maintained
Jul 11, 2013
–6 violations
- Food Protection
- Test Kit Provided
- Location Accessible
- Hand Cleaner Drying Tissue Signage
- Walls/Ceilings Designed Constructed Installed
- Premises Maintained
Jun 26, 2013
✕6 violations
- Food Protection
- Test Kit Provided
- Location Accessible
- Hand Cleaner Drying Tissue Signage
- Walls/Ceilings Designed Constructed Installed
- Premises Maintained
Dec 11, 2012
✓6 violations
- Food Protection
- Non-Food Contact Surfaces
- Hand Cleaner Drying Tissue Signage
- Floors Designed Constructed Installed
- Walls/Ceilings Designed Constructed Installed
- Premises Maintained
Dec 6, 2012
–Nov 20, 2012
✕6 violations
- Food Protection
- Non-Food Contact Surfaces
- Hand Cleaner Drying Tissue Signage
- Floors Designed Constructed Installed
- Walls/Ceilings Designed Constructed Installed
- Premises Maintained
May 7, 2012
✓3 violations
- Hand Cleaner Drying Tissue Signage
- Walls/Ceilings Designed Constructed Installed
- Premises Maintained
Apr 23, 2012
✕3 violations
- Hand Cleaner Drying Tissue Signage
- Walls/Ceilings Designed Constructed Installed
- Premises Maintained
More in Boston
Source: Boston Public Health Commission. Data shown unmodified from the official record. See something wrong? Report a data issue.
