N.U. Stetson Hall West
11 SPEARE PL, BOSTON, MA 02115
Last inspected Mar 12, 2026
Passed. Met health requirements at the latest inspection. Some health departments report pass/fail instead of letter grades.
Order for delivery
Inspection history
Mar 12, 2026
✓3 violations
- Manual Warewashing Equipment Hot Water Sanitization Temperatures (P)
- Equipment and Utensils Air-Drying Required (C)
- Repairing-Premises Structures Attachments and Fixtures-Methods (C)
Feb 26, 2026
✕3 violations
- Manual Warewashing Equipment Hot Water Sanitization Temperatures (P)
- Equipment and Utensils Air-Drying Required (C)
- Repairing-Premises Structures Attachments and Fixtures-Methods (C)
Sep 24, 2025
✓1 violation
- Repairing-Premises Structures Attachments and Fixtures-Methods (C)
Feb 11, 2025
✓1 violation
- (A) and (C) Good Repair and Calibration-Utensils and Temperature and Pressure Measuring Devices (C)
Jan 30, 2025
✕1 violation
- (A) and (C) Good Repair and Calibration-Utensils and Temperature and Pressure Measuring Devices (C)
Oct 18, 2024
✓1 violation
- Repairing-Premises Structures Attachments and Fixtures-Methods (C)
Oct 4, 2024
✕4 violations
- Characteristics-Materials for Construction and Repair (C)
- Equipment and Utensils Air-Drying Required (C)
- Floors Walls and Ceilings-Cleanability (C)
- Repairing-Premises Structures Attachments and Fixtures-Methods (C)
Sep 19, 2024
✕4 violations
- Characteristics-Materials for Construction and Repair (C)
- Equipment and Utensils Air-Drying Required (C)
- Floors Walls and Ceilings-Cleanability (C)
- Repairing-Premises Structures Attachments and Fixtures-Methods (C)
Feb 6, 2024
✓1 violation
- Equipment and Utensils Air-Drying Required (C)
Oct 4, 2023
✓2 violations
- Good Repair and Proper Adjustment-Equipment (C)
- Removing Dead or Trapped Birds Insects Rodents and other Pest (C)
Mar 2, 2023
✓2 violations
- Mechanical Warewashing Equipment Hot Water Sanitization Temperatures (Pf)
- Good Repair and Proper Adjustment-Equipment (C)
Feb 22, 2023
✕2 violations
- Mechanical Warewashing Equipment Hot Water Sanitization Temperatures (Pf)
- Good Repair and Proper Adjustment-Equipment (C)
Oct 4, 2022
✓1 violation
- (A) and (C) Good Repair and Calibration-Utensils and Temperature and Pressure Measuring Devices (C)
Sep 21, 2022
✕1 violation
- (A) and (C) Good Repair and Calibration-Utensils and Temperature and Pressure Measuring Devices (C)
Mar 15, 2022
–Feb 1, 2022
✓Sep 21, 2021
✓Jan 26, 2021
✓Sep 15, 2020
✓Oct 15, 2019
✓2 violations
- Cooling Heating and Holding Capacities-Equipment (Pf)
- Using a Handwashing Sink-Operation and Maintenance (Pf)
Oct 7, 2019
✕2 violations
- Cooling Heating and Holding Capacities-Equipment (Pf)
- Using a Handwashing Sink-Operation and Maintenance (Pf)
Mar 28, 2019
✓2 violations
- Cold Holding
- Dishwashng Facilities
Mar 20, 2019
✕2 violations
- Cold Holding
- Dishwashng Facilities
Sep 27, 2018
✓2 violations
- Hot Holding
- Food Contact Surfaces Design
Sep 19, 2018
✕2 violations
- Hot Holding
- Food Contact Surfaces Design
More in Boston
Proudly display this grade
Run N.U. Stetson Hall West? Add the live CleanPlate badge to your website — it links to this page and updates automatically with every new inspection.
<a href="https://www.cleanplateus.com/boston/nu-stetson-hall-west--21983"><img src="https://www.cleanplateus.com/api/badge/boston/21983" width="300" height="58" alt="CleanPlate health grade"></a>
Source: Boston Public Health Commission. Data shown unmodified from the official record. See something wrong? Report a data issue.
